AI work

Applying AI to engineering leadership.

This section collects the projects where I have used AI tools. Each one has a write-up of what was built, how it works, and how AI was used along the way.

The thread that connects them is in AI and engineering leadership →

Projects

Selected projects.

Featured · Case study · Built with Claude · Working prototype

Sprint Ledger

An engineering-manager dashboard that scores each direct report’s capacity, pace, and open pull requests as Red, Amber, or Green, and suggests a starting point for the next one on one. It runs on simulated data, and the write-up covers the scoring rules, the design decisions, and how AI was used to build it.

React · TypeScript · Vite · Vitest

The Sprint Ledger dashboard: a team-health strip, a progress bar, a burndown chart, and one lane per person. The Sprint Ledger dashboard in its dark theme: a team-health strip, a progress bar, a burndown chart, and one lane per person.

Case study · Live in production · Agents and workflow

Drop Shipping Automation

A print-on-demand shop run by nine AI agents, each with one job. A request moves through concept, design, copy, publishing, website sync, and promotion until the product is live for sale, with no manual hand-offs between tools. The write-up covers the agents, the workflow, and the controls that keep it dependable.

Agents · Workflow automation · Printify · Etsy

The workflow board of the agent-run shop: seven lanes, each owned by a named agent, beside the queues where work waits.

Case study · Live demo · Claude agents

Agentic Bug Management

Claude agents scan a dozen-plus repositories, from backend services to front-end clients, log what they find as ranked Jira tickets, and open a pull request with a proposed fix for each, giving a team one prioritized list to review and burn down each quarter. The first pass logged more than 150 bugs. A live demo app replays the workflow on simulated findings.

Agents · Claude · Jira · Code review

The Bug Manager app: summary cards, a repository list, and a ranked table of findings with their pull requests. The Bug Manager app in its dark theme: summary cards, a repository list, and a ranked table of findings with their pull requests.

Case study · Private, shown in screenshots · AI-configured

Homepage Dashboard

A private dashboard for my lab, configured heavily with AI. Rich cards show live numbers from every service, bookmarks managed in Karakeep are synced to the bottom of the page, and a cron job keeps it current every 15 minutes. It sits behind a VPN, so the write-up uses edited screenshots.

Homepage · Karakeep · Cron · AI-configured

The lab dashboard: groups of cards with live numbers for the hypervisor, containers, firewall, bookmarks, tasks, uptime, and DNS filtering.

Case study · Live in production · Bounded LLM service

SignalDrift

One engine running three evidence-first signal products — TechDrift, GamingDrift, SportsDrift — each white-labeled with its own source catalog, database, and identity. A self-hosted LLM, Laya, handles only bounded advisory work (topic clustering, keyword dedup, per-user analysis) and never gates what a user sees. A full admin surface covers sources, users, notifications, and ingestion health.

Node.js · Postgres · Self-hosted LLM · White-labeling · Kotlin Multiplatform

AI credentials

Training and skills.

Certificate
Certificate of Completion: AI Fluency Framework & Foundations
Listed skill
AI Fluency, one of the top skills on my LinkedIn profile
Get in touch

Want to talk about any of this?